A
01
건설
PROJECT GUNSUL STUDIO SHEET A · 01 / 06
DOMAIN gunsul.studio REV. v2 · 2026.05
건설 — gun·sul / construction

we draft we measure we build

A studio for the slow, deliberate construction of things — interfaces, identities, monuments, small machines. Drafted on paper, sealed in code, raised on site.

FOUNDED 2019
SITES BUILT 142
UNDER FRAME 6
CREW 4
A.01 Drafting Room Where pencils still beat pixels.
A.02 Fabrication Bay Code is poured here, beam by beam.
A.03 Archive Every revision. Folded, dated, kept.
A.04 Materials Concrete grays, blueprint blues, paper warmth.
B
02
단면
SHEET B / 06

Section A–A′

A vertical cut through the studio, from foundation to roof rule.

structure / blueprint
level reference
foundation / hatch
soil / ground
C
03
공정
SHEET C / 06

Construction Phases

Every project we run, in five movements.

  1. 01

    Survey · 측량

    We walk the site. We listen. We measure what is already there before we propose what should be.

    ~ 5 days · pencil & paper
  2. 02

    Drafting · 제도

    First strokes. Plan, section, elevation. We draw enough to be wrong cheaply.

    ~ 2 weeks · ink & tracing
  3. 03

    Foundation · 기초

    Naming, structure, type, palette. The slab that everything else pours over.

    ~ 1 week · concrete
  4. 04

    Frame · 골조

    HTML, layout, motion. The bones go up. Nothing yet is finished.

    ~ 3 weeks · steel
  5. 05

    Finish · 마감

    Trim. Polish. The seam where the studio quietly leaves the building.

    ~ 2 weeks · brass & glass
D
04
실적
SHEET D / 06

Selected Works

A small ledger of completed and ongoing constructions.

BUILT
D.01

House for an Index

A small static archive built around a slow-fading paper aesthetic.

  • archive
  • type
  • 2024
BUILT
D.02

Compass & Counterweight

A wayfinding system for an editorial publication, drawn from cartographic primitives.

  • wayfinding
  • editorial
  • 2024
UNDER FRAME
D.03

Pavilion Zero

A temporary digital pavilion for a local theatre season — interactive, breathing in 12s loops.

  • interactive
  • theatre
  • 2026
BUILT
D.04

Skyline for a Quiet Brand

A logotype family treated as an urban silhouette, scaled across 14 deliverables.

  • identity
  • type
  • 2023
UNDER FRAME
D.05

Bridge Routine

A long-form interactive essay about commuting, drawn as a topographic profile.

  • essay
  • scroll
  • 2026
ARCHIVED
D.06

Grid Rooms (2021)

An early experiment in modular page layouts. Now shelved, occasionally consulted.

  • research
  • 2021
E
05
자재
SHEET E / 06

Materials & Specification

A reduced palette. Most decisions, already made.

M.01

Cyanotype Blue

#0E3F73

The blueprint we keep coming back to. A reproducing blue.

M.02

Sketchpad

#F4EFE0

Off-white drafting paper, slightly aged at the edges.

M.03

Graphite

#2B2B2B

4H pencil on a long ruler. The default voice.

M.04

Drafting Red

#C0392B

Reserved. Used only for revisions, level lines, and fire.

M.05

Site Yellow

#F1C40F

Helmets, cranes, marking tape. Visibility, on demand.

M.06

Cool Cyan

#39C2D7

Tracing-paper highlights, glass, summer.

M.07

Tracing Amber

#D9C9A4

Layered overlays. Always slightly translucent.

M.08

Midnight Rule

#1A2D44

Heavy lines. Title bars. The bottom of every drawing.

SpecValueNotes
Type — DisplayCormorant Garamond, Italic 400For monumental headlines and quiet titles.
Type — SansArchivo, 300 / 500 / 900Modern grotesque for body and signage.
Type — MonoJetBrains Mono, 400 / 500For dimensions, codes, marginalia.
Grid20 mm minor / 100 mm majorAlways present. Never apologized for.
Paper#F4EFE0 with grainSubtle noise, never flat.
F
06
접촉
SHEET F / 06

Visit the Studio

Open Tuesday through Friday. Coffee on the drafting table.

DROP A LINE hello@gunsul.studio

For new constructions, archives, or just a chat about typefaces.

SITE 3F, 0–4 Mokjae-ro

A long room above a print shop. Mind the stairs.

HOURS Tue – Fri · 10 – 18

By appointment, except for the cat.

FORM C–01 · BRIEF SUBMISSION