건설.quest

Build. Stack. Complete.

건설 진행률 Building Progress
47%

퀘스트 카테고리 Quest Categories

Foundation

기초

Lay the groundwork. Excavation, concrete pouring, and base structure quests.

12 Quests

Framing

구조

Raise the skeleton. Steel beams, load-bearing walls, and structural integrity.

18 Quests

Electrical

전기

Wire the circuits. Conduit routing, panel installation, and power distribution.

15 Quests

Plumbing

배관

Route the flow. Pipe fitting, drainage systems, and water supply networks.

10 Quests

Finishing

마감

Polish the build. Interior finishing, painting, fixtures, and final inspection.

8 Quests
🔒 Complete Plumbing First
현재 퀘스트

Active Quest

구조 Framing ★★★

Steel Beam Placement - Level 3

Position and secure the primary load-bearing steel beams for the third floor. Ensure alignment tolerance of ±2mm and verify weld integrity at all connection points.

Foundation inspection passed
Level 2 framing complete
Place 4 primary beams
Weld inspection certification
Reward: +250 XP Reinforced Steel Blueprint
자재 목록

Materials Inventory

Concrete Block 콘크리트 블록 ×248
Steel Beam 철골 빔 ×64
Glass Panel 유리 패널 ×32
Timber Plank 목재 판 ×96
Rebar Bundle 철근 묶음 ×120
Copper Pipe 구리 파이프 ×78