CURB PAINT / BUILD LOW CHK 151c337d3bb1

lowest.dev

The useful work starts where polish stops and the slab begins.

remove / extra / layer
-01 / GRAVEL

start at the floor

Before the stack gets tall, make the lowest assumption visible. Everything above inherits its level.

bubble seeks stable low
base.imginitpipe
×
-02 / CRAWLSPACE

remove the extra layer

Abstractions are useful when they leave a clean underside. If they sag, cut shims until the line holds.

below the fold literally tucked under slab edge
0004081216
-03 / BEDROCK

keep the base honest

Measure twice, delete once. The foundation is not glamorous; it is simply hard to lie to.

ROOT FLOOR / 21.0m

ship from bedrock

Small surface area. Clean seams. Nothing below except the choice to keep it lower.