01
gunsul.studio
현장 승인 / PERMIT 00-A

건설

poured at 65% x 40% — organic concrete still curing

기초공사
x:65.0 / y:40.0 / slump: 183mm
01

기초공사

Earth accepts the first swelling pour. Footings do not descend; they root.

PILE_DEPTH: 18.4M / CURVE_LOAD: 7.2KN
02

골조공사

Rebar refuses the right angle and learns to braid itself like tendon.

REBAR_RADIUS: 42° / TIE_INTERVAL: 300MM
03

외장공사

The envelope bulges under its own memory, a shell poured around motion.

SKIN_THICKNESS: VARIABLE / POUR: LIVE
04

준공대기

Inspection stickers orbit the mass. Completion is postponed until the next breath.

STATUS: 공사중 / SIGNOFF: PENDING
PHASE 03 / EXTREME DETAIL

마감공사

The finishing phase spills beyond the drawing boundary. Text bends around fresh concrete while exposed rebar draws its nervous system through the night air. Nothing is aligned because the structure is still negotiating with gravity.

shape-outside: organic-form; overflow: intentional; curing-time: decades;
골조공사
타설중
양생 42%
FINAL INSPECTION / 준공

준공

gunsul.studio treats construction as a living tutorial: foundation, scaffold, rebar, cure. The finished building stands as proof that becoming can be more precise than being.