原発シミュレーター

GENPATSU.IO

外周 / perimeter survey of a boiling-water reactor facility

DOSSIER 01 / 説明室

Classified as Educational

genpatsu.io treats the nuclear plant as a system of nested responsibilities: concrete, coolant, operators, instruments, and the landscape beyond the fence. The experience is sober, precise, and built for understanding rather than alarm.

DOSSIER 02 / 安全哲学

Defense in Depth

Every layer is drawn as a physical boundary and a conceptual one. Containment walls, pressure vessels, cooling loops, and log procedures overlap so that no single reading is mistaken for the whole story.

DOSSIER 03 / 計器盤

Analog Trust Signals

Amber readouts, lavender blueprint lines, and mint-safe indicators recall Showa-era control rooms where attention was distributed across hundreds of tactile dials. Precision becomes the luxury surface.

Hover a component

図面室: Move across the blueprint. Each component brightens like an annotated drafting table, translating heavy infrastructure into readable relationships.

OPERATOR'S LOG リスク回廊

Startup survey complete. Reactor temperature steady, coolant pumps synchronized, containment pressure within the morning band.

Secondary loop shows a two-degree drift. Operators compare redundant sensors before escalating the reading beyond observation status.

Relief valve opens automatically after a transient pressure pulse. The log records sequence, duration, and return path rather than dramatic speculation.

Radiation monitors remain low while coolant chemistry is sampled. A risk corridor is a chain of small questions asked early.

Systems settle into baseline. The lesson remains: safety is not a single green light, but disciplined interpretation of many instruments.

CONTROL ROOM 制御室

UNIT 01ALL PARAMETERS NOMINAL監視継続

温度

320°C

Temperature

圧力

7.2 MPa

Pressure

流量

2850 t/h

Flow Rate

中性子束

6.2e13

Neutron Flux

放射線

0.05 mSv/h

Radiation

冷却水位

+1.2 m

Coolant Level

cooling interlock / containment fan / scram circuit / dosimeter bus