RECEIVED
CASE NO. FP-001
initial impression
SURFACE: PARTICULATE
01
5 cm
EXHIBIT A footprint.bar IMPRESSION INDEX
CLASSIFIED
IMP-001-PRESSURE
baropodometric analysis
TIMESTAMP: 03:42:17
SURFACE: POLISHED CONCRETE
weight distribution mapped
CLASS: SUPINATOR / NEUTRAL
02
10 cm
INDEXED
IMP-002-ANATOMY
plantar landmark survey
TIMESTAMP: 03:44:08
SURFACE: GLASS PLATE
12 landmarks identified
METHOD: DIRECT TRANSFER
A: HEEL STRIKE CENTER
B: LATERAL ARCH APEX
C: METATARSAL RIDGE
D: HALLUX TERMINUS
E: TOE SPLAY EXTENT
A B C D E F G H
03
10 cm
ARCHIVED
IMP-003-NEGATIVE
inverse-field extraction
TIMESTAMP: 03:47:33
SURFACE: THERMAL PAPER
ambient conditions: 18.2C
HUMIDITY: 42%
CLASS: CONFIRMED MATCH
0.042 0.038 0.051 0.047 0.089 0.091 0.076 0.082 0.124 0.118 0.133 0.127 0.167 0.159 0.172 0.164 0.203 0.198 0.211 0.205 0.245 0.238 0.252 0.241 0.288 0.279 0.294 0.283 0.331 0.322 0.338 0.326 0.374 0.368 0.381 0.371 0.417 0.409 0.424 0.415 0.461 0.453 0.468 0.457 0.504 0.497 0.512 0.501 0.547 0.539 0.554 0.543 0.591 0.583 0.598 0.587 0.634 0.627 0.641 0.631 0.677 0.669 0.684 0.674 0.721 0.713 0.728 0.718 0.764 0.757 0.771 0.761 0.807 0.799 0.814 0.804 0.851 0.843 0.858 0.848 0.894 0.887 0.901 0.891 0.937 0.929 0.944 0.934 0.042 0.038 0.051 0.047 0.089 0.091 0.076 0.082 0.124 0.118 0.133 0.127 0.167 0.159 0.172 0.164 0.203 0.198 0.211 0.205 0.245 0.238 0.252 0.241 0.288 0.279 0.294 0.283 0.331 0.322 0.338 0.326 0.374 0.368 0.381 0.371 0.417 0.409 0.424 0.415 0.461 0.453 0.468 0.457 0.504 0.497 0.512 0.501 0.547 0.539 0.554 0.543 0.591 0.583 0.598 0.587 0.634 0.627 0.641 0.631 0.677 0.669 0.684 0.674 0.721 0.713 0.728 0.718 0.764 0.757 0.771 0.761 0.807 0.799 0.814 0.804 0.851 0.843 0.858 0.848 0.142 0.138 0.151 0.147 0.189 0.191 0.176 0.182 0.224 0.218 0.233 0.227 0.267 0.259 0.272 0.264 0.303 0.298 0.311 0.305 0.345 0.338 0.352 0.341 0.388 0.379 0.394 0.383 0.431 0.422 0.438 0.426 0.474 0.468 0.481 0.471 0.517 0.509 0.524 0.515 0.561 0.553 0.568 0.557 0.604 0.597 0.612 0.601 0.647 0.639 0.654 0.643 0.691 0.683 0.698 0.687 0.734 0.727 0.741 0.731 0.777 0.769 0.784 0.774 0.821 0.813 0.828 0.818 0.864 0.857 0.871 0.861 0.907 0.899 0.914 0.904 0.951 0.943 0.958 0.948 0.994 0.987 0.001 0.991 0.037 0.029 0.044 0.034 0.142 0.138 0.151 0.147 0.189 0.191 0.176 0.182 0.224 0.218 0.233 0.227 0.267 0.259 0.272 0.264 0.303 0.298 0.311 0.305 0.345 0.338 0.352 0.341 0.388 0.379 0.394 0.383 0.431 0.422 0.438 0.426 0.474 0.468 0.481 0.471 0.517 0.509 0.524 0.515 0.561 0.553 0.568 0.557 0.604 0.597 0.612 0.601 0.647 0.639 0.654 0.643 0.691 0.683 0.698 0.687 0.734 0.727 0.741 0.731 0.777 0.769 0.784 0.774 0.821 0.813 0.828 0.818 0.864 0.857 0.871 0.861 0.907 0.899 0.914 0.904 0.951 0.943 0.958 0.948
04
10 cm
S2 SECTION CUT: FORENSIC → ARCHITECTURAL

ARCHITECTURAL

INDEXED
DWG-001 PLAN VIEW
scale 1:200
PROJECTION: ORTHOGRAPHIC
floor plan interpretation
MATERIAL: VELLUM
room assignments below
VESTIBULE ARCHIVE MAIN HALL 246.8 m² CORRIDOR FOUNDATION load-bearing A A 26.4 m (1:200) N
05
S3 SECTION CUT: ARCHITECTURAL → CHOREOGRAPHIC

CHOREOGRAPHIC

CLASSIFIED
MOV-001-NOTATION
labanotation transcription
GAIT CYCLE: NORMAL
heel strike to toe-off

SYMBOL LEGEND

Forward movement
Place (contact)
High level (elevation)
Pause / stillness
Weight transfer
Flight phase (airborne)
1 2 3 4 5 6 7 HEEL STRIKE LOADING MIDSTANCE TERMINAL TOE-OFF FLIGHT NEXT CYCLE
06

Every surface remembers.

footprint.bar